Glendale Boulevard-Hyperion Avenue Complex of Bridges Improvement

The City of Los Angeles (City) and California Department of Transportation (Caltrans) have completed an Initial Study/ Environmental Assessment (IS/EA) for the Glendale Boulevard-Hyperion Avenue Complex of Bridges Improvement Project, pursuant to the California Environmental Quality Act and National Environmental Policy Act.

The proposed project is located on Glendale Boulevard and Hyperion Avenue southeast of Glenfeliz Boulevard in the community of Atwater Village and northwest of Ettrick Street in the community of Silver Lake. 这个项目将改进几何设计, 提高地震强度, 和改善行人, bicycle and motor vehicle travel associated with the viaduct complex. 除抗震加固外, major project features include: widening of the Glendale Boulevard bridges by eight feet each, realigning the I-5 northbound off-ramp to allow left turns onto southbound Glendale Boulevard, adding bicycle lanes to the Hyperion Avenue viaduct roadway, creating a wider sidewalk on the northwest side of Hyperion Avenue, 也消除了东南的人行道. The proposed project would also reconstruct the existing deteriorated railings to look similar to the originals and construct an alternate pedestrian crossing over the Los Angeles River. The proposed work will have an effect on historic properties eligible for the National Register of Historic Places. The City and Caltrans have evaluated whether adequate mitigation measures can be incorporated into the project plans.

初步研究/国防部已向公众征询意见. A Final MND has been prepared and can be viewed in its entirety below. The Final MND consists of five transmittals and for convenience each transmittal can be viewed below.

A Final Initial Study/Mitigated Negative Declaration (IS/MND) was prepared and can be viewed in its entirety below. The Final IS/MND consists of five transmittals and for convenience each transmittal can be viewed below.

The 工务委员会 considered the Final IS/MND for the proposed project on Friday, 5月15日, 2015年10:00 a.m. 有关这次聆讯的通知可参阅下文. The hearing was held at City Hall, 200 North Spring Street, Room 350, Los Angeles, CA 90012. 在聆讯前,董事会议程已于下列地点公布: http://boe.wordsfromthecrucible.com/dpw/ebreports/.

The 公共工程 and Gang Reduction Council Committee considered the Final IS/MND for the proposed project at a hearing on June 3, 2015. On June 9, 2015, the City Council adopted the MND and approved the project. 请参考 委员会文件没有. 05-0173. The agendas for the meetings of the City Council can be viewed at http://onlineeducation.wordsfromthecrucible.com/city-calendar

If you have any questions, please contact Maria Martin at 213-485-5753.

报告
(点击斜体文本查看报告)
审核状态 公众评估期
提供IS/EA的通知 N/A N/A
最初的研究/环境评估 关闭 2013年9月12日- 2013年11月7日
公开聆讯公告    
最终MND(整份文件)    

The Final MND consists of five transmittals which can be viewed individually below

       传送1 / MND

       传递公众意见和回应

       考虑的传送设计方案

       传送4推荐选项

       传送缓解监控计划

  2015年5月15日听证会通知